See the Visuals page for various images of Zero Place. As images become available, we will post them here.

Current Master Plans

Every submission made to the New Paltz Village Planning Board is presented in the next section, including the dates of each submission.  In an effort to make it clear what the very latest set of elevations and site plans are, we will continuously update the following links that represent the current master plans:

Renderings:

Mulberry Plaza

View down Mulberry Street

View from North

View of 32N Streetscape

Landscape Rendering

Plans:

T-01 - Title Sheet

CS-01 - Site Plan

CS-02 - Existing Conditions

CS-03 - Grading & Utility Plan

CS-04 - Drainage Plan

CS-05 - Lighting Plan

CS-06 - Soil Erosion & Sediment Control & Construction Plan

Details: CS-07 - SESC, CS-08 - Site, CS-09 - Stormwater

A-01 - A-04 - Elevations and Floor Plans

A-05 - Dumpster Enclosure

L-01 - L-03 - Landscape Plans

SUBD - Resubdivision Plan

Documents Submitted for Public Consideration

Zero Place underwent the State Environmental Quality Review Process (SEQR) from March 2016 through September 2017.  All documents submitted during the process can be found on the SEQRA page.

Final Site Plan Review - Beginning September 19, 2017

2017-09-19 Submission to Village of New Paltz Planning Board

- (Submitted on 13 Sep 2017) Elevations and Floor Plans

- (Submitted on 13 Sep 2017) Site Plan

- (Submitted on 13 Sep 2017) Landscape Plans

- (Submitted on 13 Sep 2017) Landscape Rendering

- (Submitted on 18 Sep 2017) Grading & Utility Plan

- (Submitted on 18 Sep 2017) Drainage Plan

- (Submitted on 18 Sep 2017) Lighting Plan

- (Submitted on 18 Sep 2017) Soil Erosion & Sediment Control Plan

- (Submitted on 18 Sep 2017) Site Details

2017-10-03 Submission to Village of New Paltz Planning Board

- (Submitted on 26 Sep 2017) Mulberry Parking Memo

- (Submitted on 26 Sep 2017) Rooftop Terrace Memo

- (Submitted on 26 Sep 2017) Rooftop Terrace Noise Attachment

- (Submitted on 29 Sep 2017) Updated Stormwater Management Report Summary

- (Submitted on 29 Sep 2017) Updated Stormwater Management Report

- (Submitted on 2 Oct 2017) Site Plan - updated with correct bike lane markings

2017-10-17 Submission to Village of New Paltz Planning Board

- (Submitted on 6 Oct 2017) Management Proposal for Rooftop Terrace

- (Submitted on 6 Oct 2017) Updated Sediment Control and Construction Plan

 

Presentation made to the Planning Board on March 7, 2017 as a summary of the EAF response made under the SEQRA process.

 

NOTE:  This is a private website. All documents above are provided by Net-Zero Development LLC for Village of New Paltz Planning Board and community consideration.